Substations Committee
Monday, January 8 |
|||
8:00-10:00 |
SUB K0 – Gas Insulated Substations |
Borgne |
Ryan Stone |
8:00-12:00 |
SUB I0 – FACTS and HVDC Stations |
Rythyms III |
David Langner |
8:00-12:00 |
SUB WGG9 – Permanent Connections Used in Substations |
Endymion/Mid-City |
Michael Rzasa |
10:00-12:00 |
SUB E0 – Substation Civil Design |
Napoleon B1 |
Charlie Li |
10:00-12:00 |
SUB WGK11 – Guide for GIS Above 52 kV |
Borgne |
Nicholas Matone |
11:00-12:00 |
SUB G0 – Substation Grounding and Lighting |
Gallery |
Eduardo Ramirez Bettoni |
13:00-15:00 |
SUB D0 – Electrical Substation Design Subcommittee |
Napoleon B1 |
Shashikant Patel |
13:00-15:00 |
SUB WGK2 – GIS Tutorial Development |
Borgne |
Peter Grossmann |
13:00-15:00 |
SUB WGI9 – Modern Protection System for Static Var Compensators |
Nottoway |
Mikael Halonen |
13:00-17:00 |
SUB WGE8 – Substation Physical Resiliency |
Endymion/Mid-City |
Charlie Li |
13:00-17:00 |
SUB WGG4 – Substation Safety Working Group |
Rythyms III |
Jesse Rorabaugh |
13:00-15:00 |
SUB WGG8 – Substation Arc Flashy Safety |
Oak Alley |
Eduardo Ramirez Bettoni |
15:00-17:00 |
SUB WGG6TF2- Performance Testing of Substation Ground Grids – Current Injection Testing |
Gallery |
Joe Gravelle |
15:00-17:00 |
SUB WGD1 – AIS Clearances and Insulation Levels in Substations |
Napoleon B1 |
Chunming Ma |
15:00-17:00 |
SUB WGK9 – Interface of New Gas-Insulated Equipment in Existing Gas-Insulated Substations |
Borgne |
Arnaud Ficheux |
15:00-17:00 |
SUB WGI2 – Thyristor–Controlled Series Capacitors |
Napoleon D2 |
Humayun Tariq |
Tuesday, January 9 |
|||
8:00-12:00 |
SUB WGK8 – Guide for Moisture Measurement and Control in SF6 Gas Insulated Equipment |
Bayside B |
Chris Barrett |
8:00-12:00 |
SUB WGE5 – Guide for Animal Deterrents for Electric Power Supply Stations |
Napoleon C1 |
Ryan Escure |
8:00-12:00 |
SUB WGD2 – Cable Systems in Substations |
Orpheus |
Prudhvi Anand Bhattiprolu |
8:00-12:00 |
SUB I0 – FACTS and HVDC Stations |
Gallier AB |
David Langner |
8:00-17:00 |
SUB WGG6 – Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Grounding System |
Southdown |
Carl Moller |
11:30-13:30 |
SUB B0 – Admin (Invite Only) |
Rhythms III |
Patrick Fitzgerald |
13:00-15:00 |
SUB WGK14 – Guide for Condition Assessment of Gas Insulated Substations |
Orpheus |
Patrick Fitzgerald |
13:00-17:00 |
SUB WGI3 – Dynamic Reactive Power Compensators |
Bayside B |
Julie Lacroix |
13:00-17:00 |
SUB WGE2 – Containment and Control of Oil Spills in Substations |
Gallier AB |
Mike McNulty |
15:00-17:00 |
SUB WGK6 – GIS User Group |
Orpheus |
Patrick Fitzgerald |
Wednesday, January 10 |
|||
8:00-12:00 |
SUB WGK18 – Mobile Gas Insulated Substations |
Baccheus/Iris |
Scott Scharf |
8:00-12:00 |
SUB WGD9 – Substation Auxiliary Systems |
Grand Ballroom E |
Joe Gravelle |
8:00-12:00 |
SUB I0 – FACTS and HVDC Stations |
Napoleon C1 |
David Langner |
8:00-12:00 |
SUB WGE7 – Substation Physical Security |
Gallery |
Mark Smedvig |
8:00-17:00 |
SUB WGG7 – Substation Grounding Safety |
Grand Ballroom A |
Richard Keil |
13:00-15:00 |
SUB WGK19 – Guide For Handling Non-SF6 Gas Mixtures for HV Equipment |
Baccheus/Iris |
Billy Lao |
13:00-15:00 |
SUB WGI4 – Static Var Compensator |
Napoleon C1 |
Mikael Halonen |
13:00-17:00 |
SUB WGD4 – Seismic Design of Substations |
Oak Alley |
Michael Riley |
13:00-17:00 |
SUB WGE3 –Guide for Substation Fire Protection |
Grand Ballroom E |
Shashikant Patel |
13:00-17:00 |
SUB WGG5 – Direct Lighting Stroke Shielding of Substations |
Maurepas |
Aaron Wilson |
15:00-16:00 |
SUB WGK4 – Sulphur Hexafluoride (SF6) Gas Handling for High Voltage Equipment |
Baccheus/Iris |
Billy Lao |
15:00-17:00 |
SUB WGI7 – Reliability of HVDC Converters |
Napoleon C1 |
Andrew Bailey |
Thursday, January 11 |
|||
8:00-12:00 |
SUB WGD9 – Substation Auxiliary Systems |
Borgne |
Joe Gravelle |
8:00-12:00 |
SUB WGD6 – Seismic Design of Flexible Buswork |
Napoleon A12 |
Michael Riley |
8:00-12:00 |
SUB WGE8 – Substation Physical Resiliency |
Maurepas |
Charlie Li |
8:00-17:00 |
SUB WGG6TF1 – Use of Quantitative Risk Analysis (QRA) to Optimize Grounding System Design |
Grand Ballroom A |
Bill Carman |