Sunday, January 12

Meeting Room AssignedMeeting TitleMeeting ChairStart TimeEnd Time
GARDEN 2IEEE 1792: Recommended Practice for Nuclear Power Generating Station Preferred Power Supply Reliability (WG 4.6). Comment disposition and suggested changes to IEEE 1792-2017Tammy Womack2:30:00 PM4:00:00 PM

Monday, January 13

Harbor RoomNPEC SC6 Meetings: 7-4.3.2 (Programable Digital Devices).Ray Herb8:00:00 AM4:00:00 PM
Salon INPEC WG P1786 Guide for Human Factors Applications of Computerized Operating Procedure Systems (COPS) at Nuclear Power Generating Stations and Other Nuclear FacilitiesJeffery Joe8:00:00 AM4:00:00 PM
Salon VIIINPEC SC1 BreakoutRobert Konnik8:00:00 AM2:00:00 PM
SevilleSC-4 Working Group Muster RoomJason Bellamy8:00:00 AM5:00:00 PM
Salon VIIIEEE 690: Design and Installation of Cable Systems for Class 1E Circuits in NPGS (WG 4.5) Update of IEEE 690-2018Robert Konnik9:00:00 AM10:00:00 AM
Salon VIIIEEE 628: Criteria for the Design, Installation, and Qualification of Raceway Systems for Class 1E Circuits for NPGS (WG 4.9). Update of IEEE 628-2020Martin Flynn11:00:00 AM12:00:00 PM
Salon VIIIEEE 308: Standard Criteria for Class 1E Power Systems for NPGS (WG 4.1). PAR development for revision of IEEE 308-2020Timothy Lensmire12:30:00 PM1:30:00 PM
Salon VIIIEEE 1290: Guide for Motor-Operated Valve (MOV) Motor Application, Protection, Control, and Testing in NPGS (WG 4.4). Update of IEEE 1290-2015Joe Krvavac1:45:00 PM3:15:00 PM
Salon VIIIEEE 741: Criteria for the Protection of Class 1E Power Systems and Equipment in NPGS (WG 4.7 – Task Force 1). Developing new Annex for Impacts of Power Quality on Class 1E Systems Power.Mark Bowman3:30:00 PM5:00:00 PM
Salon VIIIWorking Group Chair Coordination MeetingRobert Konnik4:00:00 PM5:00:00 PM
Pacific RoomIEEE-SA Information Session for WG Chairs – Christian OrlandoRobert Konnik5:00:00 PM6:00:00 PM

Tuesday, January 14

MadridIEEE ICAP Meeting (Invitation only)Robert Konnik8:00:00 AM10:00:00 AM
ValenciaWG 6.4 (19): 7-4.3.2 (Programable Digital Devices)Ray Herb8:00:00 AM5:00:00 PM
GranadaNPEC WG 1786 – making revisions to IEEE 1786 Guide for Human Factors Applications of Computerized Operating Procedure Systems (COPS) at Nuclear Power Generating Stations and Other Nuclear FacilitiesJeffery Joe8:00:00 AM5:00:00 PM
SevilleSC-4 Working Group Muster RoomJason Bellamy8:00:00 AM5:00:00 PM
Harbor RoomNPEC SC6 Meetings: 5 groups meet at once including WG 6.5 (10): IEEE 384 (Independence), WG 6.1 (10): 497 (Accident Monitoring Instrumentation), WG 6.3 (9): 603 (Criteria for Safety Systems), WG 6.6 (5): 1891 (Intelligent Digital Devices.Ray Herb8:00:00 AM5:00:00 PM
BarcelonaNPEC WG 2421 – developing IEEE P2421 Guide for Designing and Developing Computer-Based Displays for Monitoring and Control of Nuclear FacilitiesJeffery Joe8:00:00 AM5:00:00 PM
Salon VIINPEC WG 3.3 P352: Principles of Reliability Analysis 577: Requirements for Reliability Analysis 933: Reliability Program PlansWG business meeting followed by continuation of in-progress revision of P352, Principles of Reliability Analysis.Rebecca Steinman8:00:00 AM12:00:00 PM
Salon IIEEE 2420: PAR development for 2420 “Combustion Turbine-Generator Units Applied as Standby Power Supplies for Nuclear Power Generating Stations” (NPEC WG 4.2 – Standby Power Supply)Ken Fleischer9:00:00 AM10:00:00 AM
MadridBreakout RoomRobert Konnik10:00:00 AM5:00:00 PM
Salon IIEEE 741: Criteria for the Protection of Class 1E Power Systems and Equipment in NPGS (WG 4.7). Update of IEEE 741-2022Mark Bowman10:15:00 AM11:45:00 AM
Salon IIEEE 317: Electric Penetration Assemblies in Containment Structures for Nuclear Power Generating Stations (WG 4.3). Comment resolution for ballot of IEEE 317-2013Mitchell Staskiewicz1:00:00 PM1:30:00 PM
Salon VIINPEC WG 3.1 336: Installation, Inspection & Testing 338: Periodic Surveillance Testing P1819: Risk Informed Categorization WG business meeting followed by continuation of in-progress revision of IEEE 1819, Risk-Informed Categorization.Rebecca Steinman1:00:00 PM5:00:00 PM
Salon IIEEE 1792: Recommended Practice for Nuclear Power Generating Station Preferred Power Supply Reliability (WG 4.6). Update of IEEE 1792-2017Tammy Womack1:45:00 PM2:45:00 PM
Salon IIEEE 833: Recommended Practice for the Protection of Electric Equipment in NPGS from Water Hazards (WG 4.8). Comment resolution for ballot of IEEE 833-2005Keith Bush3:00:00 PM5:00:00 PM

Wednesday, January 15

MadridNPEC WG 2421 – Developing IEEE P2421 Guide for Designing and Developing Computer-Based Displays for Monitoring and Control of Nuclear FacilitiesJeffery Joe8:00:00 AM5:00:00 PM
Grand GAuxiliary Power Group (SC-4) Business Meeting (update on working group activities, calls for interest for various working groups, technical presentations, and operational experience sharing)Jason Bellamy8:00:00 AM5:00:00 PM
Salon INPEC SC6 MeetingRay Herb8:00:00 AM12:00:00 PM
SevilleNPEC Officers Conference AdministrationRobert Konnik8:00:00 AM12:00:00 PM
ValenciaNPEC SC3 Business MeetingRebecca Steinman8:00:00 AM12:00:00 PM
SevilleNPEC Officers ADCOM Meeting (Invitation Only)Robert Konnik12:00:00 PM5:00:00 PM
GranadaNPEC WG 6.2 Safety Related SystemsRay Herb1:00:00 PM5:00:00 PM
Salon INPEC WG 6 WG MeetingsRay Herb1:00:00 PM5:00:00 PM
ValenciaNPEC WG 3.1 (cont’d) P1819, Risk-Informed Categorization revision work from 1/15/25 continues. NPEC WG 3.3 (cont’d) P352, Principles of Reliability Analysis revision work from 1/15/25 continues.Rebecca Steinman1:00:00 PM5:00:00 PM

Thursday, January 16

Grand GNuclear Power Engineering CommitteeNPEC Committee MeetingRobert Konnik8:00:00 AM5:00:00 PM