2007 IEEE PES Joint January Technical Committee Meeting

January 8-10, 2007 • Orlando, Florida, U.S.A.

Substations Committee Meeting Schedule

MV GIS Application Guide WG

MV GIS 1 – Mon, Tue, Palms Ballroom F

Working Group I8: Power Electronics Building Block Concepts

I8TF1 - Mon PM only (2-5pm), Palms Ballroom G
I8TF2 - Tue AM only (9-12noon), Palms Ballroom G
I8WG - Tue PM only (2-5pm), Palms Ballroom G

Working Group I4: Static Var Compensators (SVC)

I4 - Mon, Tue, Wed, Palms Ballroom D
I4TF1 - Mon, Revision of Std. 1031
I4TF2 - Mon, Revision of Std. 1303
General I4 Meeting and SVC Tutorial Preparation, Tue
SVC Tutorial Preparation, Wed

Each room will be equipped with an "AV package" that includes a cart, power cord, and screen.

Regarding LCD Projectors: Based on feedback from your Committee leaders, PES has tried to keep the registration fee for this meeting as low as possible. Thus, LCD projectors will not be part of the meeting package. To supply them for each meeting would have increased the registration fee 30%-50%. Each Committee Chair is encouraged to work with entity members to arrange to borrow the necessary equipment for the duration of the meeting. This policy was applied in the 2006 meeting, and worked well. We will observe how the policy works for 2007 and reassess it, if needed, for 2008.


©2013 Conference Management Services, Inc. -||- email: webmaster@pestechnical.org -||- Last updated Monday, December 11, 2006